SECTION 107313 (10536)
AWNINGS
(View
PDF format here: Awning Specification)
PART 1 GENERAL
1.1 RELATED SECTIONS
-
107113 Exterior sun control devices
-
107113.43 Fixed sun screens
-
107300 Protective covers
-
107316 Canopies
-
107326 Walkway coverings
-
133100 Fabric structures
-
133123 Tensioned fabric structures
-
133133 Framed fabric structures
1.2 SUMMARY
-
Work of this Section includes fabric awnings and metal awning
frames systems.
Related Sections
Section 06200 –
Finish Carpentry
1.3 REFERENCES
Structural welding code steel AWS D1.1
Structural welding code steel AWS D1.2
General contractors license in the states of California and
Arizona.
Los Angeles City Approved Fabricators license.
Worker’s Compensation Insurance certificate.
General liability insurance certificate in excess of $4 million.
Vehicle insurance certification.
1.4 SUBMITTALS
General: Submit each item in this article according to the
Condition of the contract and Division 1 Specification Sections.
Shop Drawings: Show shop and erection details, including cut,
copes, connections holes and welds. Show welds, both shop and field,
by the current recommended symbols of the AWS. Do not fabricate
members until shop drawings have been reviewed.
Include engineering calculations showing wind load requirements of
the local Building Department and include fastener and erection
details, signed and sealed by the qualified professional engineer
responsible for their preparation.
1.5 QUALITY ASSURANCE
Requirements of Awning manufacturer and Awning Contractor, contractor
must provide proof of certifications:
Have been in continuous operation as a professional fabric awning
manufacturer for a minimum of ten (10) years prior to this contract.
Hold a valid general contractor’s license for a minimum of five (5)
years.
Welder Qualifications: The personnel manufacturing the metal awning
frames must certified welders.
Provide written welding procedure specifications.
Professional Engineer Qualifications: A professional engineer who
is legally authorized to practice in the jurisdiction where project is
located and who is experienced in providing engineering services for
installing fabric awnings similar to those indicated fro this project
and with a record of successful in service performance.
Have a current Los Angeles City Approved Fabricator’s license.
OSHA 10 Hour Construction Industry Certified Training.
OSHA Fall Protection Training.
Job site installation crew must include one CPR trained member on
the job site at all times of the installation.
The installation crews must have a copy of the awning company’s
Code of Safety practices at the job site during times of installation.
Hold daily Safety Tail Gate Meetings before start of installation
work.
When forklifts are used at the job site, the operator must be Fork
Lift Operation Trained.
Certified California AB1825 Sexual Harassment Training.
The awning fabricator must provide proof they have an ongoing
written Quality Assurance program for five (5) years or more.
The awning fabricator must provide proof of it full-time Quality
Assurance manager.
The awning manufacturer must provide proof of $4 million general
liability insurance coverage.
The awning manufacturer must provide proof of workers compensation
insurance coverage.
It is recommended that the awning contractor be a current member of
a professional trade association, i.e., Professional Awning
Manufacturers Association, the Western Canvas Products Association or
other established related trade association.
1.6 WARRANTY
Warrant frame materials and workmanship against defects for a
period of one (1) year from date of substantial completion of the
Work.
Warrant fabric materials and workmanship against defects for a
minimum period of five (5) years, on a prorated basis, from the date
of substantial completion of the work and/or offer the same warranty
offered by the fabric mill that manufactured or supplied the fabric.
PART 2 PRODUCTS 2.1 AWNING MANUFACTURERS
Approved Manufacturers:
Eide Industries, Inc., 16215 Piuma Avenue, Cerritos, CA 90703,
Phone: (562) 402-8335, Fax: (562) 924-2233, Email:
info@eideindustries.com,
Website:
www.eideindustries.com |
www.awnings.com
2.2 AWNINGS
Awning shapes:
Standard Window Awning
Standard Window Awning with Solid Valance
Convex Awning
Concave Awning
Dome Awning
Long Dome Awning
Patio Canopy
Rounded Entrance Canopy
Gable Roof Entrance Canopy
Hip Roof Entrance Canopy
Free Standing Cabana Canopy
Fabric: Sunbrella® 100 percent acrylic fiber, color as selected by
Architect, manufactured by Glen Raven Mills or other exterior grade
fabric awning material that carries a minimum five (5) year
manufacturer’s warranty. Based on the city’s requirements, the
architect is to specify if the fabric must be flame retardant to meet
California Fire Marshal requirements or equal.
Frames: Minimum 1-inch square 16GA galvanized steel ASTM A 500
tubing or 1” square .125 ASTM B 221 aluminum tubing, welding to AWS
standards with welds ground smooth. Frames designed for wind loads,
snow loads and seismic requirements as required by structural
engineering requirements.
Frames: All corners are to be mitered or completely welded to AWS
standards.
Metal welding: All joints must be mitered or completely welded to AWS standards, ground smooth, primed and painted.
Use Eide Aluminum Awning Rail molding to attach fabric cover to
head bar.
Anchors: Anchoring hardware shall be galvanized, zinc-coated 3/8”
diameter or greater.
Painting: Two coats of polyester powder coat required when the
awning installation is within 4 miles of the ocean or Painting: Shop
primer shall conform to FS TT-P-615d (2). Type 1. Use Rustoleum brand
paint 2185 zinc –rich spray when further than 4 miles from the ocean.
Calking: Acrylic latex or silicone sealant at head bar and wall
junction.
Use aluminum side molding to attach material to head bars.
Sewing tread, must be
Gore Tenara® brand or equal.
2.3 FABRICATION
Fabricate awning and frames in strict accordance with the reviewed
shop drawings, written welding procedure specifications and the
reference standards.
Awning Frame Finish: Frames and metal components are to be
polyester powder coat painted.
PART
3 INSTALLATION 3.1 INSTALLATION
Minimum ten (10) years awning installation experience required by
the awning contractor.
Buildings are to be field measured by the awning contractor prior
to awning manufacture and awning installation.
Install awnings and frames in strict accordance with the Drawings
and the reviewed shop drawings, and provide appropriate building code
requirements and aligned and plumb.
Welding procedures and operation shall comply with the referenced
standard. Welding electrodes shall comply with ASTM A 233, E-70
Series. Grind smooth exposed welds; finish welds to the inside.
Installation firm must hold a current contractor’s license.
END OF SECTION
|